Campus Recreation

A Place For Everyone.

University of Illinois at Urbana-Champaign Student Affairs

Campus Recreation
ARC, Suite 1430
201 East Peabody Drive
Champaign, IL 61820
(217) 333-3806
campusrec@illinois.edu

Renovation Project Objectives

Social Challenges

  • enhance quality of campus life
  • prioritize and respond to recreation demands
  • cultivate social atmosphere
  • increase sense of community
  • encourage student, faculty and staff interaction
  • promote diversity

Campus Planning Objectives

  • provide compatible architectural character
  • enhance campus fabric, open spaces and linkages
  • strengthen vision of a distributed recreation system
  • enhance accessibility
  • create a design that inspires
  • foster campus neighborhood concept

Environmental Responsiveness

  • utilize solar flow to minimize heat gain and maximize patron comfort
  • incorporate low VOC materials and finishes
  • utilize recycled materials
  • recycle construction waste
  • utilize prevailing winds
  • optimize energy reclaim system and natural daylight

Interior Environment

  • create a compelling spatial experience and a variety of spacial alternatives
  • create a welcoming, inclusive atmosphere
  • enhance personal safety and security
  • create a healthful interior environment
  • develop a media-rich environment
  • establish multi-use concepts
  • enhance building control
  • produce nightscape vision of activity

Project Management Perspective

  • cost/schedule compliance
  • resource allocation strategy
  • partnering process: design construction
  • regulatory compliance
  • sequence construction activity to maximize access
  • increase operational efficiencies

Key Considerations

  • staff safety and efficiency
  • resource accessibility
  • wellness perspective
  • patron self sufficiency
  • awareness of deficiencies in indoor pool
  • family actiivity options