Renovation Progress
Phase II Updates
- Surface coating to begin on the arches.
- Replacement of the floor at the north end of Gym 1 to take place during winter break. At that time, the East Wing entrance will be moved to the east side of the building. Gym 2 will then be used for basketball while the floor is being replaced.
- Climbing wall is 85% complete.
- The two entrance stair towers (on either side of the entrance) now have brick and limestone coverings.
Renovation Photo Archives
Phase II
Phase I: Complete
CRCE, now completed, was the major renovation of Phase I. While the east end of IMPE was prepared for Phase II, CRCE saw a complete overhaul and more than doubled in size.
- CRCE NOW OPEN!
- March 16, 2005 (CRCE)
- January 24, 2005 (CRCE)
- September 30, 2004 (Inside CRCE and East Wing)
- August 18, 2004 (CRCE)
- June 18, 2004 (Inside CRCE and Gym 1)
- June 11, 2004
- May 5, 2004
- April 14, 2004 (Inside Gym 1)
- April 14, 2004
- April 2, 2004
- March 17, 2004
- February 12, 2004
- December 15, 2003
- November 4, 2003
- October 21, 2003 (Groundbreaking)
- July 17, 2003 (Meeting with architect)
- March 2, 2003 (Meeting with architect)
Above: Rendering of the 34-foot climbing wall
in the ARC.
Below: CRCE interior after completion.
When asked their impressions of the newly renovated space at CRCE, here are quotes from some of our patrons:
- "I live in Allen Hall and I am SO lucky!"
- "My life just got a whole lot better!"
- "It's like a very fancy hotel."
- "Good work!"
- "Definitely worth the wait!"
- "My breath is taken away!"
- "I am so pleased."
- "This is spectacular!"
- "I love the openness."
- "This place is so beautiful it is like a dream!"